Contractor License Exam Preparation  ·  Test Prep Only  ·  Not a State Agency
Home  ›  Florida  ›  Permits and Contractor Requirements in Deltona
Volusia County, Florida

Permits and Contractor Requirements in Deltona

Updated October 2026

Deltona's Building Services Division handles permitting, plan review and inspections from City Hall, 2345 Providence Boulevard, Deltona, FL 32725 (386-878-8660, permitting@deltonafl.gov). Office hours are 8 a.m. to 5 p.m., with in-person service 8 a.m. to 4 p.m. The city is in Volusia County.

Who can apply for a permit

Per the city's FAQ:

Deltona checklists require the building permit application to list subcontractors for each trade. If any contractor is listed as "to be determined," you must file a new, completed application before the permit is issued. So line up your electrical, plumbing, mechanical and roofing subs before you submit.

New construction checklists

Deltona's 2024 checklists apply the FBC 2023 8th Edition, the 2020 NEC, and the 8th Edition Florida Fire Prevention Code. The city says incomplete or emailed applications are not accepted. For a new single-family home, the minimum items are:

Item Detail
Building permit application Signed, listing subcontractors for each trade
Fees at submittal $30.00 nonrefundable submittal fee plus plan review fee
Plans One set, signed and sealed by a Florida registered architect or engineer
Truss engineering Sealed, with layout, if applicable
Energy Energy calculations with Manual J, D and S
Products Door and window installation specs and Florida Product Approval
Site Plot plan and sealed survey; city right-of-way use permit for the driveway; tree removal permit application

Doing business with the office

The division has an online self-service portal to apply for, track and pay for permits (for permits submitted after July 16, 2019). It also has a virtual queue, so you can get in line up to 30 minutes before you arrive. Inspections are scheduled through the automated line, 386-575-6900, with the permit number and a three-digit inspection code.

Business tax: city only

To do business in Deltona you need a city-issued business tax receipt, even for a home-based business. Email the application and documents to BTax@deltonafl.gov, or file in person at City Hall, first floor, near the permitting windows (386-878-8560). State-regulated businesses get their state license first. Home-based businesses need a fire inspection.

The city's Business Tax Office page notes that Volusia County no longer issues BTRs. The county confirms it repealed its business tax ordinance effective January 1, 2024. Some older pages on the city site still say a county receipt is needed. The repeal controls.

FAQ

Can I email my permit application? Not for new construction. The city's checklists say emailed applications won't be accepted. Use the online portal or apply in person.

Do I need a Volusia County BTR for my Deltona business? No. The county repealed it effective January 1, 2024.

Can I submit with the plumber "to be determined"? You'll have to file a new, completed application listing the plumber before the permit is issued.

License first

Deltona permits require a licensed contractor for each trade. See residential, plumbing and HVAC. Every CILB construction license requires the Business and Finance exam. Prepare with our Florida Business and Finance Exam Prep.

Sources

National Trades Institute
An independent test-preparation provider. Not a school, and not affiliated with or endorsed by any state licensing board, DBPR, NASCLA, or Pearson VUE.  ·  Privacy  ·  Terms  ·  Refunds  ·  Contact